Custom Kitchen Hardware
Why Yuanzao put quality control first? Jul 13, 2026
Our major product including wire, sheet metal and tubular hardware, such as oven wire rack, airfry basket tray, side shelf rack, top grid, slide wire drawer, wire basket, storage holders and other kitchen organizer.

In hardware, a fraction of a millimeter makes all the difference. That's why Yuanzao put quality control first.
We inspect every critical dimension, surface, and mechanical property — from incoming materials to finished parts. Our in-process checks and final audits ensure that nothing defective leaves our factory.

We ensure strict quality control through the following five key measures:


1. Dimensional Control

Dimensional control is the foundation of quality.

-Gauges shall be manufactured in accordance with customer drawings and used for parts inspection.

-All finished products shall be subject to acceptance inspection in accordance with the customer's CTQ (Critical to Quality) specifications.



2. Process Inspection

Our in-process checks monitor production at every stage — from raw material to finished part — to catch deviations early and maintain consistent quality throughout.


Appearance workmanship(Level 1)

-Surface (no scratch, damage, dents, dirts, sharp edges, gaps, deformation, etc.)


-Color (material, paint, plating,enamel,electrolysis)

-Cleanliness of surface

-Mechanical damages (no big scratch/es, bumps, hits, etc..)

-Manufacturing failures (no rust deformation, rust screws, sharp edges, bad welding)



3. Salt Spray Test

To verify corrosion resistance, we perform salt spray tests on coated and plated surfaces, ensuring our products can withstand harsh environments and prevent rust.

Purpose

Check whether the surface appears the rust issue after the 24/48-hour salt spray test.

NO.

Project

Test Standard

Operation

1

Concentration of the Salt Solution

5%±1

5%

2

pH value of the Salt Solution

6.5-7.2

7

3

Spray volumn

1.0-2.0ml/80cm2

2

4

Air Pressure

1±0.01kgf/cm2

1

5

Laboratory Relative Humidity

Over 85%

95%

6

Pressure Drum Temperature

47±1℃

47

7

Salt Solution Temperature

35±1℃

35

8

Sample Placement Angle

1. Freely Hanging
2. Lean at 15 degrees

15°


4. Drop Test


We conduct drop tests to evaluate structural integrity and packaging effectiveness, ensuring our products survive transportation and handling without damage.



5. Packaging Acceptance Inspection

Our final packaging is inspected against customer requirements for protection, labeling, and cleanliness — ensuring that what arrives on site is ready to use, safe, and complete.

Get the latest offers Subscribe for our newsletter
Please read on, stay posted, subscribe, and we welcome you to tell us what you think.

click here to leave a message

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Home

Products

about

contact